Chat with us, powered by LiveChat
[References:]||WAESCHEFABRIK, Berlin, Germany

References:
WAESCHEFABRIK, Berlin, Germany

The WAESCHEFABRIK, a former industrial building located at Gerichtstraße 27 in Berlin, was constructed between 1910 and 1912 by Berliner Wäschefabrik AG. The building is situated in the Berlin district of Wedding, in close proximity to Wedding city train station.

The project

The building is a listed five-storey factory with a basement and a long inner courtyard. Thanks to ongoing and careful maintenance measures over the past decades, the original structure of the building has been preserved to this day.

As part of a revitalization project, the building is currently being transformed into a modern sustainable office space in an industrial loft style, aiming for LEED Gold certification. The inner courtyard, previously used as a parking lot, will be greened and made available as a communal space for all building users upon completion.

BCL is responsible for the construction logistics planning and execution.

© a2b.graphics
© xoio GmbH
© xoio GmbH

Services in detail

Consultating/planning

  • Updating of construction site equipment planning
  • Construction logistics manual

Execution

  • Delivery traffic management
  • Space management
  • Floor logistics / material handling
  • Waste disposal and cleaning logistics (full service)
  • Container facilities
  • Winter services
  • Carpentry work

 

 

 

 

 

 

Further information

Location Gerichtstraße 27
13347 Berlin, Germany
Germany
Services Planning & Execution
Usage Office building
Start of construction July 2020
Completion October 2024
Project type Construction (modernisation)
Contracting entity apoprojekt GmbH, Holstenwall 5, 20355 Hamburg
Architect Bollinger + Fehlig Architekten
Gross floor area (GFA) 16500 m²
Number of upper floors 5
Number of basement floors 1

Sustainability

  • Bundling of delivery traffic flows
  • Separation of construction waste by type and disposal via certified companies