The office high-rise building with 18 above-ground floors consists of two slender discs, which are rotated from the 8th floor off-axis and shifted against each other. In the basement is the underground parking garage with over 200 parking spaces. In an adjacent part of the building, an 8-story low-rise building with mixed use was created. The planning came from the Berlin architectural firm Eike Becker_Architekten.
The building was completed at the end of 2022 and handed over to the tenant «Frankfurter Allgemeine Zeitung».
BCL was responsible for the construction logistics planning (work phases 1 to 6 according to AHO booklet 25).
Consulting/Planning
Location |
Frankfurt/Main Germany |
---|---|
Services | Planning |
Usage | Office tower and hotel |
Start of construction | September 2019 |
Completion | December 2022 |
Project type | Construction (new building) |
Contracting entity | PGE Grundstücksgesellschaft Europaviertel mbH, Prinzregentenstraße 22, 80538 München |
Architect | Eike Becker_Architekten |
Gross floor area (GFA) | 45496 m² |
Number of upper floors | 18 |