Chat with us, powered by LiveChat
[References:]||University Medical Centre Rostock, new building Central Medical Function, Rostock, Germany

References:
University Medical Centre Rostock, new building Central Medical Function, Rostock, Germany

As part of the renovation and restructuring of the Rostock University Medical Centre, the construction of the new building Central Medical Function (ZMF = Zentrale Medizinische Funktionen) began in 2015, which is being built between the existing buildings of the Surgery Department and the Centre for Internal Medicine and is now almost complete.

The project

The building consists of three upper floors, a basement and a staggered floor as well as a helipad.  Once completed, it will form the interdisciplinary centre for the surgical and internal medicine disciplines and act as the main access to Rostock University Hospital.

BCL was responsible for the construction logistics planning, for the updating of this and for the execution of the construction logistics. 

A special challenge: the construction work is taking place during ongoing hospital operations.

 

Visualization of the new construction of the central Medical Function of the University Medical Centre Rostock, Rostock, Germany
© Prof. HP. Haid, architect, Nuremberg/www.haid-architekten-stadtplaner.de
Rear view of the University Medical Centre Rostock, Rostock, Germany."
© Builder owner: Staatliches Bau- und Liegenschaftsamt Rostock (SBL Rostock), owner, operator, user: Rostock University Medical Centre (UMR Rostock)
View of the construction site of the University Medical Centre Rostock, Rostock, Germany
© Builder owner: Staatliches Bau- und Liegenschaftsamt Rostock (SBL Rostock), owner, operator, user: Rostock University Medical Centre (UMR Rostock)

Services in detail

Consulting/planning 

  • Feasibility study
  • Logistics manual
  • Construction logistics concept
  • Preparation of tender for construction logistics
  • Updating of construction logistics planning 

Execution 

  • Coordination of construction site logistics
  • Delivery traffic control (online notification)
  • Disposal logistics (full service)
  • Access control and guarding
  • Construction site equipment (e.g. signage, toilets for hire, construction electricity / lighting, construction water, transport platforms / construction lifts)
  • Street cleaning and winter service

Further information

Location Schillingallee 35
18057 Rostock
Germany
Services Planning & Execution
Usage Hospital / university
Start of construction October 2015
Project type Construction (new building)
Contracting entity Staatliches Bau- und Liegenschaftsamt Rostock (SBL Rostock), Wallstraße 2, 18055 Rostock
Architect P HAID architekten ingenieure Nuremberg, www.haid-architekten-stadtplaner.de
Gross floor area (GFA) 27245 m²

Sustainability

  • Bundling of delivery traffic flows
  • Separation of construction waste by type and disposal via certified companies