[References:]||Marienufer residential quarter, Berlin, Germany

References:
Marienufer residential quarter, Berlin, Germany

Marienufer, one of the largest new construction projects in south-east Berlin, is being built on Wendenschloßstraße in Berlin-Köpenick. The listed park with the historic Villa Bolle is being carefully integrated into the modern neighborhood concept.

The project

Around 1,200 apartments in 64 buildings are being built on an area of over 150,000 square meters - supplemented by underground parking, a daycare centre, cafés, retail and office space. The district is pursuing a sustainable concept with DGNB Gold certification, generous green spaces, barrier-free apartments and a modern open space design - for a lively coexistence of all generations.

The development will be realized in three construction phases, spread over a total of 17 building plots. Up to six residential buildings are planned on each plot.

The development area borders directly on a wooded area and the banks of the River Dahme. Wendenschloßstraße serves as the central access axis. Due to the surrounding residential buildings, special measures are required to control construction site traffic. The aim is to minimize the impact on residents and the public transport network during the construction period. Precise coordination of delivery traffic is therefore essential.

BCL is responsible for planning and implementing the construction logistics.

BCL project Marienufer in Berlin-Köpenick
© Deutsche Wohnen / Beyonity
BCL project Marienufer in Berlin-Köpenick
© Deutsche Wohnen / Beyonity
BCL project Marienufer in Berlin-Köpenick
© BCL

Services in detail

Consulting/planning

  • Construction logistics phase planning (update)
  • Logistics manual (update)
  • Authority management (traffic regulations incl. traffic sign and special use planning)

Execution

  • Construction site logistics coordination
  • Access control (incl. Zuko container, turnstile system, barrier system)
  • Security, video surveillance incl. video system
  • Delivery traffic control (online avization)
  • Storage area management
  • Container facilities (operator model), sanitary containers
  • Sanitary container, company paramedic
  • Cleaning, disposal of waste
  • Street cleaning, winter road clearance
  • Construction site equipment (site fencing, site electricity, site water, site lighting, site signage, etc.)
  • Construction support services, key management, flushing of water-bearing pipes and ventilation of apartments
  • Protective measures, winter construction/construction heating, irrigation of construction roads
  • Moving support (lifting gear/transport equipment)

Further information

Location Wendenschloßstraße 254
12557 Berlin, Germany
Germany
Services Planning & Execution
Usage Residential buildings, halls of residence, hotels
Start of construction May 2021
Project type Construction (new building)
Building owner GSW Immobilien AG, Mecklenburgische Straße 57, 14197 Berlin, respresented by Quarterback Berlin GmbH
Contracting entity GSW Immobilien AG, Mecklenburgische Straße 57, 14197 Berlin, respresented by Quarterback Berlin GmbH
Architect Lorenz Mayer Architekten
Plot size 156000 m²
Gross floor area (GFA) 137000 m²
Number of upper floors 5
Number of basement floors 1

Sustainability

  • Bundling of delivery traffic flows
  • DGNB Gold certification is being sought on site